top of page
Blastec Logo - 01-02.png

Feature Project

Sandy Lane Yacht Club and Residences
  • Developed a blasting plan and associated schedule​

  • Provided supervision and set out drilling works.

  • Conducted explosive blasting operations as required; set out the blasting patterns required to produce specified rock harvest needs.

  • Identified the drilling grid and co-ordinate with the drilling team on the operations to be carried out to engage in the planning of earthworks for the blasting operations.

  • Provided general consultation relating to

    • Mining

    • Purchase of explosives and associated products for the works.

  • Provided consultation of mining safety

Other Blastec Projects